Structure |
Appliances |
|
|
|
|
Parkade and commercial level walls reinforced concrete,
heated and c/w fire suppression |
Garburator wiring |
|
Exterior foundation wall damp-proofing |
Stainless Steel fridge |
|
2 x 6 exterior wall construction |
Stainless Steel self- cleaning oven |
|
Reinforced concrete main floor slab |
Stainless Steel dishwasher |
|
Concrete over subfloor, over engineered floor system (2nd,
3rd & 4th floors) |
White washer & dryer |
|
Engineered wood roof trusses |
Stainless Steel microwave hood fan |
|
|
|
|
Exterior |
Plumbing & Heating |
|
|
|
|
Low maintenance exterior cladding includes a contemporary
combination of steel, stucco, and brick. |
Double stainless steel kitchen sink |
|
Prefinished aluminum/glass balcony railings (where
applicable) |
Lever faucets |
|
Balcony decks covered with durable outdoor vinyl flooring
(where applicable) |
Tub c/w shower curtain rod |
|
Extruded PVC double glazed sealed windows |
Infloor heating |
|
Patio doors to deck areas (where applicable) |
Gas BBQ outlet on patio deck |
|
|
Fully sprinklered building |
|
Interior Finishes |
Direct vent bathroom, kitchen and laundry exhaust |
|
|
|
|
1/2" drywall to interior walls |
Electrical |
|
2 coats of paint on walls, textured ceilings |
|
|
Maple cabinets throughout |
Bycical storage |
|
Granite or Quartz kitchen counter tops |
Individual electric meters |
|
Tile kitchen backsplash |
Sitework |
|
Tile backsplash on all vanities |
Concrete sidewalks |
|
9' ceilings throughout except at bathroom |
Landscaping c/w irrigation system |
|
Non-ceramic tile flooring in entrance, kitchen and bathrooms |
Central mail pick-up |
|
Panel doors (paint grade) c/w painted wood doors, jambs &
casing |
Garbage disposal room |
|
Painted wood baseboards and window casing |
Assigned storage locker in parkade |
|
All hardware and washroom accessories are chrome/brushed
chrome or pewter. |
Telephone, cablevision, Cat #5 (high speed capacity), and
prewired for security |
|
Suite entry fire rated panel door |
|
|
Carpet with underpad |
Sound Proofing |
|
Hardwood Flooring |
|
|
Window blind coverings |
Incorporating many of the latest specifications and
recommendations of the C.M.H.C. Acoustics manual |
|
Choice of 3 designer selected colour packages |
Double Insulated bathroom ceilings and common walls for
sound control |
|
Wire shelving systems |
Party walls |
|
Insulation |
- Double 2 x 4 wall, staggered in framing |
|
|
- 1" airspace |
|
R-20 exterior wall insulation |
- 1 Layer R-12 in each wall |
|
R-40 blown attic insulation |
- Perimeter acoustic caulking |
|
|
- 5/8" drywall on each wall 2nd, 3rd and 4th Floor: |
|
|
- Concrete over subfloor, over engineered floor system (2nd,
3rd & 4th floors) |
|
|
- R-12 insulation at floor joists between floors |
|
|
- 5/8" drywall on 1/2" resilient channel at ceilings (1/2
drywall only at fourth floor ceiling) |